The LADBS NEC Standard Electrical Load Calculation form is a tool designed to help individuals and professionals accurately determine the electrical load of a building as per the National Electrical Code (NEC) requirements. This form ensures that electrical systems are appropriately sized and installed to handle the anticipated load, promoting safety and efficiency. It is an essential step in obtaining the necessary permits for electrical work within the jurisdiction covered by the Los Angeles Department of Building and Safety (LADBS).

Launch Editor Now
Jump Links

When embarking on any construction or renovation project in Los Angeles that involves electrical work, familiarizing oneself with the LADBS NEC Standard Electrical Load Calculation form is paramount. This crucial document plays a vital role in ensuring that all new constructions and renovations meet the required electrical codes set by the Los Angeles Department of Building and Safety (LADBS). The form helps to calculate the standard load for various electrical installations in a building, ensuring safety and compliance with the National Electrical Code (NEC). It's designed to guide contractors, electricians, and homeowners through the process of accurately determining the electrical load of a building, thereby preventing overloading and potential hazards. Understanding how to properly complete this form is essential for anyone looking to navigate the electrical aspects of their project smoothly and efficiently, ensuring that all work is up to code and that their project will not face electrical issues down the line.

Preview - LADBS NEC Standard Electrical Load Calculation Form

NEC Standard Electrical Load Calculation for Single Family Dwellings

(Only for Service Ratings of 120/240V, 225 Amps Max)

 

 

Owner:

 

 

 

 

Location:

 

 

 

 

 

 

 

Total Floor Area of Dwelling (NEC 220.12)

 

 

 

 

 

 

 

 

 

SQFT.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Factor

 

 

 

 

 

 

 

 

Quantity

 

 

Volt Amperes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(VA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

“General Lighting”

 

 

 

 

 

 

 

 

 

 

 

 

 

1.

General Lighting (SQFT X 3 VA/SQ FT (Table 220.12)

3 X

sqft.

 

 

 

2.

Small Appliance Circuits (1500 VA per circuit)

(NEC

1500 X

 

 

 

 

 

220.52(A)) (minimum 2)

 

 

 

 

 

 

 

 

 

 

 

3.

Laundry Circuit (1500 VA per circuit) (NEC 220.52(B))

1500 X

 

 

 

 

4.

Total General Lighting Load (Add lines 1, 2 & 3):

 

 

 

 

 

 

 

 

5.

First 3000 VA @ 100%:

 

 

 

 

 

 

 

 

 

3000

6.

Total General Lighting Load – 3000 =

 

 

@ 35%=

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.

Net General Lighting Load (Per NEC 220.42) (Add lines 5 & 6):

 

 

 

 

 

 

 

 

 

 

 

 

*Fixed Appliances(if insufficient space, use back):

 

 

YES

NO

 

 

 

Garbage Disposal

 

 

 

 

 

 

 

 

 

 

 

 

 

Bathroom Fan

 

 

 

 

 

 

 

 

 

 

 

 

 

Microwave

 

 

 

 

 

 

 

 

 

 

 

 

 

Dishwasher

 

 

 

 

 

 

 

 

 

 

 

 

 

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

8.

3 or less Appliances,

Total Appliance VA;

 

 

 

 

 

 

 

 

 

 

 

 

4 or more Appliances,

75% of Total Appliance VA (NEC 220.53):

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*Other Loads (including motors, EV charger(s), etc.)

 

 

YES

NO

 

Nameplate Rating

 

 

 

(VA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9. Electric

Range (8000VA or Nameplate)**

 

 

 

 

 

 

 

 

 

 

 

10. HVAC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11.

Electric

Oven

 

 

 

 

 

 

 

 

 

 

 

 

 

12.

Electric

Dryer (5000 VA minimum)**

 

 

 

 

 

 

 

 

 

 

 

13.

Electric

Vehicle Charger

 

 

 

 

 

 

 

 

 

 

14.

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15.

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16.

25% of largest motor (NEC 430.24)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total Service Load Volt-Amperes (VA) (Add lines 7, 8 & 9 thru 16) =

 

 

 

 

Total Service Load Volt-Amperes / 240-volts =

 

 

Amperes

 

 

 

 

***Service Rating (Amperes)=

*For every “YES” answer, indicate VA rating of equipment

**Nameplate rating must be used if larger

***Service Rating shall be greater than or equal to the Service load

As a covered entity under Title II of the Americans with Disabilities Act, the City of Los Angeles does not discriminate on t he basis of disability and, upon request will provide reasonable accommodation to ensure equal access to its programs, services and activities.

NEC Standard Electrical Load Calculation (Rev. 03-23-2016)

www.ladbs.org

Form Characteristics

Fact Name Description
Purpose The LADBS NEC Standard Electrical Load Calculation form is designed to assure that electrical systems in new constructions or renovations within the City of Los Angeles meet the requirements of the National Electrical Code (NEC).
Governing Law It is regulated under the National Electrical Code, as adopted by the Los Angeles Department of Building and Safety (LADBS), which incorporates local amendments to the standard NEC provisions.
Scope The form is used for calculating electrical load requirements for residential and commercial buildings to ensure safety and compliance with the NEC.
Usage Electrical contractors, engineers, and architects use the form during the planning and permitting phases of construction or renovation projects within Los Angeles city limits.
Key Sections Includes sections for general information, detailed load calculations, summary of total load, and specific notes and exceptions as per Los Angeles amendments to NEC standards.

How to Use LADBS NEC Standard Electrical Load Calculation

Getting your electrical load calculation right is a crucial step in ensuring that your building's electrical system is safe, efficient, and compliant with local regulations. The Los Angeles Department of Building and Safety (LADBS) NEC Standard Electrical Load Calculation form is designed to help with this process. Before you start filling out the form, ensure that you have all necessary information about your property and its electrical requirements. Completing this form accurately will provide a solid foundation for the electrical planning of your project.

Filling out the LADBS NEC Standard Electrical Load Calculation form involves several key steps:

  1. Start by entering the project address and permit application number at the top of the form.
  2. Identify the type of occupancy for the building and specify the precise use of the premises.
  3. List the total area in square feet for the building or area being calculated. This will be essential for determining certain load calculations.
  4. Calculate the general lighting load by noting the number and types of lighting fixtures or the total wattage. The form may provide standard wattage values per square foot for different types of occupancy.
  5. Record the nameplate ratings of all significant appliances and motors. This includes items like HVAC systems, refrigeration units, and commercial kitchen equipment.
  6. Add any specific loads not covered by the general calculations. This might involve outdoor lighting, security systems, or specialized equipment pertinent to the building's use.
  7. Determine the largest motor's load and include it in the calculation as specified by the form's instructions.
  8. Total all loads to find the overall electrical demand for the site. The form should guide you through adjusting this figure to account for diversity, or varying usage patterns, which could reduce the total demand.
  9. Review the form for any sections that might not apply to your project and mark them as not applicable (N/A). This helps clarify that you didn't simply overlook these parts.
  10. Sign and date the form, affirming the accuracy of the information provided. If you're working with an electrical engineer or consultant, they might also need to sign.

After completing the form, the next steps typically involve submitting it to the LADBS along with any other required documents for your project. The department will review your submission and inform you if additional information is needed or if your project moves to the next stage of the approval process. Accurate and thorough completion of the LADBS NEC Standard Electrical Load Calculation form is vital for a smooth approval process and the successful execution of your electrical project.

Important Queries on LADBS NEC Standard Electrical Load Calculation

What is the LADBS NEC Standard Electrical Load Calculation form used for?

The LADBS NEC Standard Electrical Load Calculation form is a tool designed to help individuals and professionals calculate electrical loads in compliance with the National Electrical Code (NEC) as adopted by the Los Angeles Department of Building and Safety (LADBS). This calculation is crucial for ensuring that electrical systems in buildings are appropriately sized and safely meet the electrical demands of the structure.

Who needs to fill out this form?

Any homeowner, contractor, or engineer planning to undertake electrical work that requires a permit in the city of Los Angeles needs to fill out this form. It's especially critical for new constructions, major renovations, or when adding significant electrical loads to an existing system.

How do I determine the electrical load of my project?

To determine the electrical load of your project, you'll need to account for all the electrical components that will be part of the system. This includes lighting, appliances, heating and cooling systems, and any other electronic devices that will draw power. The form guides you through calculating these loads step by step, referring to specific NEC tables and rules for precise figures.

Can I submit this form online?

Whether you can submit this form online depends on the current LADBS submission guidelines. Generally, the LADBS encourages online submissions for faster processing. It's advisable to check the official LADBS website or contact their office directly for the most up-to-date information on submission methods.

What happens if I make a mistake on the form?

Errors on the form can lead to delays in your project's approval or even require resubmission of the form. If you discover a mistake after submission, contact LADBS as soon as possible to correct the error. It's beneficial to double-check your calculations and the information provided before submission to minimize errors.

Is there a fee associated with the LADBS NEC Standard Electrical Load Calculation form submission?

Yes, there is usually a fee for processing this form as part of the permit application process. The fee can vary based on the size and scope of your project. For the most accurate and current fee information, refer to the LADBS fee schedule available on their website or contact the LADBS directly.

Common mistakes

When filling out the LADBS NEC Standard Electrical Load Calculation form, individuals often encounter challenges that can lead to mistakes. Recognizing and avoiding these mistakes is crucial for ensuring the accuracy and reliability of the electrical load calculations. Below are eight common errors:

  1. Overlooking small appliances - People often forget to account for all small appliance loads, such as microwaves, toasters, and other kitchen appliances. These might seem insignificant individually, but collectively, they can significantly impact the total load calculation.
  2. Ignoring future expansion plans - When calculating the electrical load, it's essential to consider any future additions or modifications to the building. Failure to do so can result in an inadequate electrical system that cannot accommodate growth or changes.
  3. Miscalculating the square footage - An accurate measurement of the total living space is crucial. Errors in calculating the square footage can lead to incorrect load calculations, as the size of the area directly affects the total electrical demand.
  4. Underestimating lighting load - Adequate lighting is critical in both residential and commercial spaces. However, people often underestimate the lighting load, which can lead to an undersized electrical system unable to support all lighting fixtures.
  5. Misclassifying spaces - Not all areas within a building consume power equally. Misclassifying spaces, such as confusing commercial with residential areas, can skew the load calculation, as different standards apply to different types of spaces.
  6. Not considering voltage drop - For longer circuits, the voltage drop can be significant and should be factored into the load calculation. Failing to account for this can result in undersized wiring and potential safety hazards.
  7. Ignoring diversity factors - Not all devices operate simultaneously at their maximum capacity. Ignoring the diversity factor can lead to an overestimation of the electrical load and an unnecessarily oversized electrical system.
  8. Omitting the impact of motors - Motors, such as those in HVAC systems, have starting currents that can be several times their operating currents. Not accounting for the startup loads can result in a circuit breaker tripping unnecessarily.

Accuracy in filling out the LADBS NEC Standard Electrical Load Calculation form is paramount. Common pitfalls can be avoided with careful planning and a thorough understanding of the electrical needs of the structure in question. Ensuring all relevant factors are considered will lead to a safer and more efficient electrical system.

Documents used along the form

When tackling any project that demands strict adherence to electrical codes and standards, the Los Angeles Department of Building and Safety's (LADBS) NEC Standard Electrical Load Calculation form stands out as a critical document. However, it's just a piece of the puzzle in the intricate process of planning, permitting, and executing electrical work. Various other forms and documents are commonly used in conjunction with it to ensure a holistic and compliant approach to electrical installations and modifications. Let's explore five such documents that play pivotal roles in this process.

  • Electrical Permit Application Form: Before any electrical work can commence, an Electrical Permit Application must be submitted and approved. This document outlines the scope of work planned, providing details such as the project location, the applicant's contact information, and the specifics of the electrical installation or modification. Approval of this form grants the holder the authority to proceed with the work in compliance with local regulations.
  • Panel Schedule: This document accompanies the load calculation form and provides a detailed breakout of each circuit in the electrical panel. It includes information such as the circuit number, the type of current (AC/DC), voltage, amperage, and the intended use or location for each circuit. The Panel Schedule ensures that the electrical panel is organized and load balanced, which is essential for both safety and functionality.
  • Energy Efficiency Compliance Documentation: To ensure that electrical installations comply with energy conservation standards, this documentation is often required. It demonstrates how the electrical design incorporates energy-efficient measures, such as LED lighting or ENERGY STAR appliances, conforming to local or state energy codes. This documentation is essential for obtaining approval on projects with an energy efficiency component.
  • Site Plan: For projects that involve exterior electrical work, a site plan is necessary. This document provides an overhead view of the property, indicating the location of existing and proposed electrical systems, such as underground wiring, exterior lighting, and service connections. A site plan helps reviewers understand the physical context of the electrical work, ensuring that it's planned safely and does not interfere with other property elements.
  • Inspector Checklist: While not always submitted with the initial application, an Inspector Checklist is a critical document used during the inspection phase of the project. This list outlines the specific items and areas that inspectors will review to verify compliance with the National Electrical Code (NEC) and local amendments. The checklist can be a helpful guide for contractors to prepare for an inspection, ensuring that all aspects of the electrical work meet standard requirements.

Together, these documents form a comprehensive suite essential for navigating the process of electrical work within the regulatory framework established by the LADBS and other relevant authorities. Each plays a unique role in ensuring that electrical installations are safe, efficient, and compliant with the latest codes and standards. When used alongside the NEC Standard Electrical Load Calculation form, these documents equip professionals with the necessary tools to execute their projects successfully and responsibly.

Similar forms

The LADBS NEC Standard Electrical Load Calculation form is closely related to the HVAC Load Calculation form. Both serve the purpose of estimating the energy requirements of buildings but focus on different aspects. While the electrical load form calculates the electrical demand of the entire property, the HVAC Load Calculation zeros in on the heating, ventilation, and air conditioning systems. These calculations are essential for designing systems that are both efficient and adequate for the property's needs.

Similarly, the Residential Energy Compliance Form is akin to the LADBS NEC Standard Electrical Load Calculation form. The Energy Compliance Form is used in the construction industry to demonstrate that a new home meets specific energy efficiency standards. Like the electrical load calculation, it's a critical step in ensuring that new constructions adhere to legal requirements for energy use, focusing on the insulation, windows, and overall energy consumption of the home.

A Building Permit Application form also shares similarities with the electrical load calculation form. This document is a prerequisite for starting most construction or renovation projects and typically requires detailed information about the project, including some level of load calculation. The electrical load calculation form might even be a component of the information required for a building permit, emphasizing the electrical aspects of the project's design.

The Electrical System Design Plan is another document that complements the LADBS NEC Standard Electrical Load Calculation form. This design plan outlines the proposed electrical system for a new building or renovation, including layouts for wiring, outlets, and fixtures. The load calculation form provides the necessary data to inform and validate the choices made in the system design, ensuring that the electrical infrastructure can safely and efficiently handle the anticipated load.

The Utility Connection Application shares objectives with the electrical load calculation form by detailing a property's electrical demands to the utility provider. This application is crucial for ensuring that the utility can supply adequate power to the site and for setting up billing accounts. The load calculation data helps utility providers plan for demand and prevent issues with under or over-supply of electrical power to properties.

Another related document is the Home Inspection Report, which assesses a property's current state, including the electrical system. Although it's more comprehensive, covering everything from roofing to plumbing, the inspection report may refer to electrical load calculations to highlight whether the existing electrical system meets the home's needs or requires upgrades, particularly in older homes or those with significant renovations.

The Energy Audit Report, focusing on evaluating a building's energy use and efficiency, also parallels the LADBS NEC Standard Electrical Load Calculation form. It identifies ways to reduce energy consumption and improve efficiency. The insights from an electrical load calculation can inform parts of the energy audit, specifically relating to the electrical systems' contribution to the overall energy footprint of the property.

Finally, a Project Cost Estimation document, which outlines the expected expenses for a construction or renovation project, relates closely to the load calculation form. Understanding the electrical system's requirements, as determined through load calculation, plays a key role in accurately forecasting the costs associated with electrical work, including materials and labor. This estimation ensures that budgets are realistic and sufficient to cover the electrical system's needs.

Dos and Don'ts

Filling out the LADBS NEC Standard Electrical Load Calculation form is an important step in ensuring that electrical installations comply with safety and regulatory standards. Here's a list of dos and don'ts that can help guide you through the process:

  • Do gather all necessary information before you begin. This includes details about the property's electrical usage, such as the types of appliances, their wattages, and the total area of the building.
  • Do use a calculator or electrical load calculation software to ensure accuracy. Mistakes due to manual calculations can lead to incorrect installations which might not be safe or compliant.
  • Do double-check the form for any updates. The Los Angeles Department of Building and Safety (LADBS) may revise the form based on changes in the National Electrical Code (NEC) or local amendments.
  • Do consult with a professional electrician or electrical engineer if you are unsure about any part of the calculation. Their expertise can prevent costly errors.
  • Do not estimate or guess measurements and load requirements. Inaccuracies can result in insufficient power supply or overload, leading to potential safety hazards.
  • Do not leave any sections incomplete. If a section does not apply, mark it as "N/A" (not applicable). Incomplete forms may be rejected or cause delays.
  • Do not use outdated versions of the NEC or refer to outdated electrical codes. Always ensure you are referring to the latest standards and regulations.
  • Do not forget to review and verify all the information before submission. Ensure that all calculations are correct and that the form is fully and legibly completed.

Adhering to these guidelines can significantly ease the process of filling out the LADBS NEC Standard Electrical Load Calculation form and help ensure that electrical systems are designed safely and effectively.

Misconceptions

Understanding the Los Angeles Department of Building and Safety (LADBS) National Electrical Code (NEC) Standard Electrical Load Calculation form is crucial for ensuring a building's electrical system is both safe and compliant. However, misconceptions about how to properly complete this form can lead to confusion or errors. Let's address eight common misunderstandings:

  • It’s only for new constructions: Many believe this form is exclusively meant for new constructions, overlooking its necessity in significant renovations or upgrades where electrical demands might change.
  • The same form applies to all types of buildings: While the form serves a common purpose, specifics can vary depending on the building type, such as residential, commercial, or industrial, due to their unique electrical needs and codes.
  • Every section must be filled out: Not all sections will apply to every project. It's vital to review and fill out only those parts relevant to the specific electrical load requirements of the building.
  • Calculation formulas are the same for every part of the form: The form comprises various sections, each requiring different calculation methods based on factors like total square footage or specific appliance loads. Understanding the appropriate formulas for each section is crucial.
  • Estimates are sufficient for completion: Accuracy is key when completing the form. Estimates can lead to under or overestimating the electrical load, resulting in either an unsafe or an overly expensive electrical system.
  • Approval is guaranteed once submitted: Simply submitting the form does not guarantee approval. The LADBS reviews submissions for accuracy and compliance with the NEC. Adjustments may be necessary if discrepancies are found.
  • Only electricians need to understand the form: Architects, engineers, and contractors, among others, should also understand how to correctly complete the form. A collaborative approach ensures accuracy and compliance from the design phase through to construction.
  • Use of the form is a one-time requirement: Actually, any major modifications to a building's electrical system might necessitate reevaluation and resubmission of the form to ensure ongoing compliance with current NEC standards.

Clarifying these misconceptions is fundamental to the successful submission and approval of the LADBS NEC Standard Electrical Load Calculation form. Such diligence ensures building projects are not only code-compliant but also safe for all occupants.

Key takeaways

The Los Angeles Department of Building and Safety (LADBS) NEC Standard Electrical Load Calculation form is an essential tool for ensuring that electrical systems in buildings are designed with adequate capacity. Here are key takeaways to consider when filling out and using this form:

  1. Ensure all provided information is accurate and up-to-date to reflect the current and planned electrical usage in the building. This helps in preventing electrical overloads and future issues.
  2. Familiarize yourself with the National Electrical Code (NEC) as this form is guided by its standards, which set the foundation for electrical safety in residential, commercial, and industrial occupancies.
  3. Complete every section of the form thoroughly; incomplete forms may lead to delays in approval or requests for corrections, which can impact project timelines.
  4. Use the correct unit of measurements as indicated on the form to avoid miscalculations that could lead to inadequate electrical services.
  5. For sections involving calculations, double-check your work. Errors in calculation can lead to either an oversized or undersized electrical system.
  6. When calculating total load, remember to include all potential energy sources and consumption points in the building to ensure the electrical system can handle peak demands.
  7. Consult the LADBS and NEC guidelines for specific requirements on unique installations or unusual loads. Some equipment or installations might need special considerations.
  8. Consider future expansion or modifications to the building that might increase electrical demand. Designing for future needs can save time and money down the line.
  9. Keep a copy of the completed form for your records. This can serve as a reference for any future modifications or in case of audit by the LADBS.
  10. When in doubt, seek professional advice. An experienced electrician or electrical engineer can provide invaluable assistance in filling out the form accurately.

By following these guidelines, individuals can help ensure their projects proceed smoothly without unexpected delays or costs related to electrical systems. It also ensures that electrical installations are safe, efficient, and compliant with current codes and standards.